Electrical Engineering

Complete recycling plant MCC design & build, electrical process installation, general electrics, earthling and fire alarm

  • Complete recycling plant MCC design & build, electrical process installation, general electrics, earthling and fire alarm.
  • Complete electrical design of entire project to include all electrical aspects as detailed below, liaising with client, plant supplier and mechanical contractor to adhere to strict deadline for completion of works.
  • Design, installation & commissioning of Form 4 type 7 fixed pattern control panel
    • Fixed cubicle, not withdrawable.
    • Separate Marshalling cubicle for;
      • PLC
      • I/O
      • Signal
    • Approximate MCC Dimensions (L) 7000m * (H) 2100m * (D) 770mm
    • Rated to 415VAC, 50Hz, 400 Amp
    • Motor List as follows
      • Quantity 2 * 55Kw
      • Quantity 2 * 7.5 Kw
      • Quantity 15 * < or = 4.0 Kw (Minimum cable sizing for 4.0Kw)
      • Quantity 1 * Spare cubicle
      • At this stage for sizing purposes all motors will have an IP21 Alan Bradley VSD within separate internal cubicle. Mechanical ventilation for each included.
    • I/O Detail
      • For each motor 4 * Inputs & 1 Output
      • A total of approximately 30 sensors will operate in a Zone 22 area for the control of the plant,
      • Pepperl & Fuchs barrier allowance for each sensor within MCC
    • Supply of all equipment
      • All VSD’s
      • PLC Equipment
      • HMI
    • Switchgear Make
      • Allen Bradley as standard.
    • Commissioning & Delivery
      • MCC will be I/O tested before delivery to site.
      • MCC will be assembled and flash tested on delivery to site.
  • Process Installation
    • Liaising with German Plant Manufacturer.
    • All Power & Control Cable Installation, Glanding, Termination & Commissioning required ATEX sstandard.
    • All Pneumatics Installations.
  • General Services
    • General power requirements to include 110 Volt & 415 Volt sockets.
    • Ex lighting installations.
    • Ex fire alarm installations.
    • Required earthling of structure and plant.
  • Completing contract installed and commissioned ahead of schedule over an 8 week period from date of order of MCC.
  • Contract Duration – 2 Month