Electrical Engineering

Wastewater Treatment Process Plant

  • Liaising with Main contractor and Plant Manufacturer.
  • Stainless Steel Basket & Bracketing, Galvanised Tray and Control Nodes Install.
  • Power & Control Cable Install.
  • Pneumatics Install.
  • Commissioning.

Contract Duration – 4 Month

Project Details

Date:

November 19 2020


Category:

Electrical Engineering

Our Brands